Notice: Undefined index: HTTP_REFERER in /home4/mab2923/public_html/wp-content/plugins/contact-form-7-leads-tracking/wpshore_cf7_lead_tracking.php on line 76
Project Highlight – Hardwood Floor Installation – 2700 sq ft 1st floor – Clayton | Fine Floorz

Here are some pictures of a hardwood flooring job we completed in Clayton. As you see from the photos, there were a number of technical details we needed to work through. This material used was a dark walnut, with a satin grain forward finish. Walnut can be challenging because of its hardness, the saws and blades used to cut the wood, often overheat, so work management was a key success factor on this job. It was scheduled to take 4 days, we finished in 2 and a half days, with literally no waste, and one VERY happy home owner.
You can see from the top down picture of the riving room, that this was a complete floating floor of the downstairs.